運(yùn)用彩鋼圍擋有哪些好處?
來源:http://practicetypingtests.com/ 發(fā)布時(shí)間:2021-11-07
比:施工圍擋首要是運(yùn)用時(shí)刻長(zhǎng)-運(yùn)用時(shí)刻半年以上是經(jīng)濟(jì)的,運(yùn)用1年以上才。
Ratio: the construction enclosure is mainly used for a long time - it is economical to use it for more than half a year and can only be used for more than 1 year.
用處環(huán)境廣:工地圍擋抗風(fēng)抗雨防撞力強(qiáng),首要用于路程兩側(cè)防撞,不易損壞,全體漂亮度好,運(yùn)用時(shí)刻長(zhǎng),建筑工地用于代替磚砌墻體,增加風(fēng)險(xiǎn)性,下降本錢,增加墻體分量,抗風(fēng)防雨效果好;按設(shè)計(jì)規(guī)范間斷設(shè)備,全體效果遠(yuǎn)超磚砌墻體,外觀平坦不易變形,不退色,設(shè)備廣告畫面雜亂,是一種理想圍墻材料。
Wide use environment: the site enclosure has strong wind and rain resistance and anti-collision ability. It is mainly used for anti-collision on both sides of the journey, which is not easy to be damaged. The overall beauty is good and the application time is long. The construction site is used to replace the brick wall, increase the risk, reduce the cost, increase the weight of the wall, and have good wind and rain resistance effect; According to the design specification, the equipment is interrupted, and the overall effect is far better than the brick wall. The appearance is flat, not easy to deform and not fade. The advertising picture of the equipment is messy. It is an ideal enclosure material.
高度可定制:地鐵圍擋是彩鋼板在工廠用具有的滾壓成型機(jī)限制成型,規(guī)范高度爲(wèi)1.8米和2米,其他標(biāo)準(zhǔn)高度可依據(jù)客戶需求間斷定制,0.8米--5米高度均可消費(fèi),每擋長(zhǎng)度可任意定制。
Height customizable: the subway fence is formed by the rolling forming machine of color steel plate in the factory. The standard height is 1.8m and 2m. Other standard heights can be customized intermittently according to customer needs. The height of 0.8m-5m can be consumed, and the length of each gear can be customized arbitrarily.
運(yùn)輸方便:長(zhǎng)度1.58米-1.78米,10張板塊體圍一件,在施工現(xiàn)場(chǎng)工人間斷拼裝。
Convenient transportation: the length is 1.58m-1.78m, and 10 plates are enclosed in one piece, which is intermittently assembled by workers on the construction site.
裝置雜亂快速:以高度1.8米規(guī)范型爲(wèi)例,3個(gè)工人在正常狀況下可設(shè)備長(zhǎng)度150米-250米,以一個(gè)工地施工打圍2000米核算,6個(gè)設(shè)備工人4-6天即可設(shè)備終了。工地設(shè)備條件的不同會(huì)影響設(shè)備速度,如施工基礎(chǔ)差,甲方工地未協(xié)調(diào)好人工搬運(yùn)距離遠(yuǎn),下雨等會(huì)影響設(shè)備時(shí)刻長(zhǎng)短。
The device is messy and fast: Taking the standard type with a height of 1.8m as an example, three workers can the equipment length of 150m-250m under normal conditions. It is calculated as 2000 meters around a construction site, and six equipment workers can finish the equipment in 4-6 days. Different site equipment conditions will affect the equipment speed. For example, the construction foundation is poor, Party A's site is not well coordinated, the manual handling distance is long, and rain will affect the time length of the equipment.
本文的內(nèi)容是由臨邊護(hù)欄給您提供,我們專注客戶需求,不斷的發(fā)展,為客戶提供更多的服務(wù),詳情可參考我們的網(wǎng)站http://practicetypingtests.com
The content of this article is provided to you by the edge guardrail. We focus on customer needs, continuous development and provide customers with more services. For details, please refer to our website http://practicetypingtests.com